Drayage Directory
you are here: Intermodal Metro Map > Dray Rates MINNE/ST. PAUL >               
 
To send out your own request for dray rates: www.loadmatch.com/account/postings_loads.cfm
 
These dray rates came from: Minne/St. Paul dray list
The rates below are from draymen who responded to container loads posted on the board. NOTE these rates are what draymen are bidding ...probably not what the Shipper/Broker ended up paying.
Dray Rate History Over MINNE/ST. PAUL Terminals   (10 results)
ingate/outgate   sort by pickup | sort by delivery FSC TOTAL   One-Way
miles
Per Mile sort by
(fuel incl)
clear sort
    $759 Average (Base+Fuel only) 102 Avg $3.72 --by Date--  
40' CPR - Minneapolis J554 MSP direction of load movement  MN Austin () 400 32% = $528 + FSC depends on the day it is loaded. C... 106 miles () $2.49 2023-Jul-25
40' CPR - Minneapolis J554 MSP direction of load movement  MN Austin () 510 38% = $704 $250 Hazmat $150 Reefer $40 Chassis re... 106 miles () $3.32 2023-Jul-24
St. Paul MN Rail MSP direction of load movement  55912 MN Austin () 422 42% = $599 Hazmat: $200 **CP Rail Surcharge. $1... 101 miles () $2.97 2023-Jun-13
St. Paul MN Rail MSP direction of load movement  55912 MN Austin () 450 30% = $585 + FSC depends on the day it is loaded. C... 101 miles () $2.90 2023-Jun-12
St. Paul MN Rail MSP direction of load movement  55912 MN Austin () 575 35% = $776 Rail congestion fee $35.00 (one-time fla... 101 miles () $3.84 2023-Jun-12
BNSF - St. Paul (Midway) J828 MSP direction of load movement  MN Austin () 1200 25% = $1500 102 miles () $7.35 2023-Apr-17
BNSF - St. Paul (Midway) J828 MSP direction of load movement  MN Austin () 460 36% = $625 Chassis Rental $40/Day Chassis Repositi... 102 miles () $3.07 2023-Apr-17
20' BNSF MSP direction of load movement  MN MN Austin () 675 22% = $824 plus chassis rent-45 chassis split-85... 101 miles () $4.08 2023-Apr-7
20' BNSF MSP direction of load movement  MN MN Austin () 700 25% = $875 all included 101 miles () $4.33 2023-Apr-7
40' CP : 630 30th Ave NE Minneapol MSP direction of load movement  55912 MN Austin () 445 28% = $570 CP Surcharge $125.00 If needed, Chassis... 101 miles () $2.82 2020-Dec-11
 
These dray rates came from: Minne/St. Paul dray list
To send out your own request for dray rates: www.loadmatch.com/account/postings_loads.cfm